Turnkey crushing & screening plant

From your site survey to first saleable ton

One contract, one factory, one responsible team — from line design through manufacture, shipment, installation guidance and acceptance testing at rated capacity.

60 daysStandard machine lead time
1Supplier for the whole line
1,000 unitsAnnual capacity
~30Export countries

"Turnkey" means different things to different suppliers, so here is what it means to us, in full, before you ask. We design the line, we manufacture every machine in it, we pack and ship it, we guide the installation, we supervise commissioning to rated capacity, we train your operators, and we supply the spare parts afterwards. One contract, one party answerable for whether the line works.

What it does not include — and we are explicit about this because it is where buyers get misled — is geological survey, mine design, plant operation on your behalf, or a guarantee of your metallurgical recovery. Those are construction and process-engineering services, and we are a manufacturer. Read the boundaries box below before you read the price.

The four stages

Selection & line design

You send material type, feed size, hardness and target capacity. We return a flow sheet, an equipment configuration with models, and utility requirements — power, water and footprint.

Manufacturing

Machines and structural steel are produced at our three bases. Critical parts are machined in-house; every unit is assembled and tested before shipment. Standard lead time 60 days.

Installation & commissioning

Foundation drawings, packing and loading plans, then on-site or remote installation guidance and commissioning supervision by our engineers, through to trial run at rated capacity.

Training & acceptance

Operator and maintenance training, trial run to rated output, and acceptance against agreed capacity and product size. Warranty and spare-parts supply begin from day one.

What we commit to: capacity and product-size compliance, configuration and flow-sheet design, installation and commissioning guidance, operator training, warranty and spare-parts supply (within two months worst case, engineer attendance within 10 days if remote diagnosis does not resolve it). What we do not claim: geological survey, mine design or plant operation on your behalf — we make the machines; you run the business.

What is in the turnkey scope

Turnkey scope — what is included and what is not
ItemIncludedNotes
Flow sheet and equipment selectionYesProduced from your material and target product, issued as a configuration sheet
Equipment manufactureYesEvery machine in the line, built in our own works
Structure, chutes, bins, conveyorsYesSelf-fabricated to the same drawings as the machines
Foundation and GA drawingsYesIssued ahead of shipment so civil works proceed in parallel
Packing, loading plan, sea freight coordinationYesNaked or frame-box packing, FCL plan for your forwarder
Installation guidance on siteYesOur engineers, on site or remote by agreement
Commissioning supervision to rated capacityYesIncluding trial run and product-size acceptance
Operator and maintenance trainingYesDelivered at commissioning by the engineers on site
WarrantyYesTerms stated in the contract, in the same words we publish
Spare parts supplyYesWithin two months worst case; typically far faster for running models
Customs documentation supportYesSONCAP, PVoC, TBS, SABS and related — assistance through clearance
Electrical installation and site civil worksBy clientYou or your contractor; we supply drawings and answer queries
Mine design, geological survey, process guaranteesNoOutside our scope — we are a manufacturer, not a process contractor
Plant operation or maintenance on your behalfNoNot offered, at any contract value

The quotation follows this table item by item, so there is no ambiguity about what you are buying. Anything in the "by client" row is something we will specify clearly rather than leave for you to discover.

Project timeline, typical 300 t/h line

Configuration and flow sheet3–7 days from complete material data
Quotation and technical clarificationWithin 1–2 weeks of configuration sign-off
Manufacture60 days standard machine lead time from order confirmation
Shipment to port1–2 weeks from works to Chinese port
Sea freightWest Africa typically 3–5 weeks; Southeast Asia typically 2–3 weeks
Installation and commissioning4–8 weeks on site for a 300 t/h line, depending on how much site work the client handles
HandoverOperator training, O&M manual, spare-parts list and first-year wear schedule at acceptance
On the delivery promise. The 60-day figure is our standard machine lead time and we hold to it for standard models because machining is in-house. For large gyratory units, custom structural packages or multi-line projects, we will give you a firm project date instead of a standard-model number — an accurate date is worth more to your civil works contractor than an optimistic one.

Send your material and target product — get a line and a timeline

Material type, feed gradation, target capacity, required product sizes and site conditions. You get a flow sheet, an equipment list with models, utility requirements and a project timeline.