When a mine's tonnage outgrows a jaw crusher, the primary becomes a gyratory: continuous crushing, a large feed opening and a throughput that a single machine can hold for its whole service life.
A gyratory crushes continuously: the mantle gyrates inside a fixed concave, so material is broken on every part of the stroke rather than on one forward-and-back cycle. That is why, above roughly 700–800 t/h, gyratories take over from jaw crushers in hard-rock primary duty — the throughput per unit of installed power is higher and the feed opening is far more tolerant of run-of-mine rock.
The trade-off is height and capital. A gyratory needs a tall, heavy foundation and is a project rather than a purchase. It makes sense where the mine has decades of planned production and the primary will run for 6,000+ hours a year.
Typical duty: primary crushing of iron ore and other hard metal ores, and large quarry operations feeding 1,500–2,500 t/h downstream circuits.



Product and workshop photographs from our own production lines — Hangzhou, Weihai and Wuhu.
Published as a real HTML table, not a PDF or an image — so it can be read, copied and indexed. Figures are from our own product documentation; the datasheet and GA drawing follow on request.
| Model | Feed opening (mm) | Max feed size (mm) | Discharge setting (mm) | Capacity (t/h) | Power (kW) | Weight (t) |
|---|---|---|---|---|---|---|
| SK.56.14 | 560 | 480 | 40–80 | 750–1,500 | 400 | 38 |
| SK.50.20 | 500 | 420 | 50–100 | 1,000–2,000 | 500 | 80 |
| SK.90.22 | 900 | 760 | 150–200 | 1,000–2,000 | 400 | 120 |
| SK.120.24 | 1,210 | 1,020 | 210–230 | 1,800–2,500 | 400 | 232 |
Capacity depends strongly on discharge setting, ore work index and feed gradation. For metal-ore primary duty we ask for a Bond work-index figure or a representative ore sample before recommending a model.
Motor and drive arrangement sized to the duty cycle; soft-start recommended above 400 kW on weak grids.
Hydraulic setting adjustment with position indication.
Concave and mantle profiles matched to your ore abrasiveness, with a scheduled liner-life plan supplied at handover.
Foundation and anchor-bolt drawings, erection sequence, and commissioning supervision by our engineers.
We provide a first-year wear-parts forecast based on your ore, so your store does not discover the requirement during a shutdown.
| Item | Commitment |
|---|---|
| Standard machine lead time | 60 days from order confirmation |
| Annual production capacity / monthly shipments | 1,000 units per year · 100 units per month (all ranges) |
| Spare parts supply | Within 2 months worst case; typically far faster for models in current production |
| Engineer attendance on site | Within 10 days of the requirement being agreed, for export markets |
| Remote support | Response within one working day; included, not charged |
| Warranty | Terms stated in the contract in the same words published on this site |
| Installation & commissioning | Guidance and supervision by our engineers, through to acceptance at rated capacity |
| Buyer provides | Site civil works, electrical installation and site access — drawings and answers supplied |
We supply the machines, the drawings, the commissioning support and the parts. We do not operate your plant after handover.
Broadly above 700–800 t/h in hard-rock duty, and sooner where the feed gradation is wide. Below that, the foundation cost of a gyratory is hard to justify. We will run the comparison for your specific duty if you send feed gradation, target tonnage and ore type.
Better than a jaw in some respects, because the crushing action is continuous and the chamber is less prone to packing. Very sticky ore still calls for a scalping arrangement ahead of the primary. Tell us the moisture range at your site.
Standard machine lead time is 60 days, but at the top of the gyratory range please treat that as a starting point and confirm with us at order — we will give you a firm date rather than a marketing one.
Material, feed size, target capacity and product sizes gets you a model recommendation and a price — not a catalogue.