Installation & commissioning

Getting a line from the port to rated capacity

Between the ship arriving and the first saleable ton, there are four things that decide the schedule: foundations, packing discipline, installation quality and commissioning discipline. We support all four — and we promise guidance and acceptance testing, not plant management.

10 daysEngineer attendance commitment
4–8 weeksTypical site duration, 300 t/h
1 dayRemote support response
WrittenAcceptance criteria

What we do before the ship leaves

Installation starts in the factory, not on your site. Foundation and general-arrangement drawings are issued ahead of shipment so your civil works can run in parallel with manufacture rather than after it — the single largest schedule saving available on an overseas project.

  • Foundation and anchor-bolt drawings issued before shipment, with the load data your civil contractor needs.
  • Packing specification and loading plan — naked, frame-box or containerised by item, with an FCL plan for your freight forwarder.
  • Anti-rust preservation for ocean transit, and marking that matches the installation drawing so parts are identifiable at the port.
  • Installation sequence and alignment instructions included in the documentation set, so your team can plan labour and crane time before the ship docks.

What we do on site

Our engineers attend site to guide installation and supervise commissioning through to acceptance at rated capacity. How much attendance you need depends on your team and your site — some clients ask us to supervise the whole mechanical erection, others only want us present for alignment, belt tracking, electrical interlocks and the trial run. Both are workable; we agree the scope before you place the order so it is priced honestly.

Commissioning itself is a sequence, not an event: no-load rotation checks, lubrication system proving, interlock testing, dry run, load-up in stages, then trial run at rated capacity with product-size verification. We do not declare a line commissioned on the strength of one good hour.

Commissioning sequence and what is verified at each step
StepWhat is checkedWho signs it off
Foundation acceptanceAnchor positions, level and grout condition against the foundation drawingClient's civil contractor and our engineer
Mechanical erection & alignmentCrusher alignment, drive coupling, conveyor and screen installation, chute clearancesOur engineer with client's installation team
Lubrication & hydraulic provingOil levels, flows, pressures, temperature interlocks and alarm set pointsOur engineer
Electrical & interlock testingMotor rotation, starting sequence, emergency stops, interlocks between machinesClient's electrical contractor and our engineer
Dry run (no load)Rotation, vibration, belt tracking, screen amplitude, control responsesOur engineer and client's maintenance lead
Load-up in stagesFeed rate increase with monitoring of power draw, temperatures and product samplesOur engineer
Trial run at rated capacitySustained throughput and product gradation against the agreed specificationBoth parties — the acceptance record
Operator & maintenance trainingOperating procedure, wear inspection routine, planned maintenance schedule, safe isolationOur engineer, with attendance recorded

Acceptance criteria are agreed in writing before commissioning starts, based on the capacity and product sizes in the configuration sheet. A criterion agreed afterwards is an argument; a criterion agreed beforehand is a contract.

The four things that actually delay overseas projects

Foundations not ready

The most common cause of a stalled installation. Which is why we issue foundation drawings before shipment — the civil works are the client's scope, and they need the data early.

Port clearance and inland transport

An unstamped customs document holds the whole shipment. We supply the documentation set and assist through clearance, and we advise on inland leg transport to remote sites — the leg that most often exceeds expectation.

Parts identification on arrival

A 40-foot container of marked parts with a matching installation drawing is a one-week erection. An unmarked load is three. This is a packing discipline, and it is designed in.

Commissioning without criteria

If nobody wrote down what "working" means before the trial run, no result will be accepted. We agree capacity and product-size criteria in writing at configuration stage.

Boundaries, again, because this is where they matter most. We provide installation guidance and commissioning supervision. We do not perform your civil works or your electrical installation (we supply the drawings and answer your contractor's questions), and we do not take over plant operation after handover. Remote support responds within one working day; if a site visit is needed, our engineers will be on site within 10 days of the requirement being agreed.