No. Daily tonnage divided by 24 is not hourly capacity — the three figures are three steps on a staircase, and mixing them up leads to the wrong machine size.
Throughput is set at three levels: annual, daily and hourly. Annual throughput follows from the scale of the plant; daily throughput is annual throughput divided by the number of working days per year; hourly throughput is daily throughput divided by working hours per day — and working hours per day equals shifts per day times hours per shift.
Neither divisor is a full value: the plant does not run 365 days a year, and it does not run 24 hours a day. Where hand-picking, ore washing or other pre-rejection operations sit upstream, the crushing plant has to process more than the downstream sections. Dividing daily tonnage by 24 assumes three full shifts at full load every day; sizing equipment on that understated intensity leaves you running at full load daily and still short of target.
Shuangjin sizes machines on one number — hourly throughput. Don't quote daily tonnage when you enquire.
Applicable models: The full Shuangjin range of crushing equipment
Related product: Crushing equipment range
Ask us directly. If it is a question we are asked often, it becomes the next article — and you get the answer either way.