At 200 t/h the question is less about how big each machine is and more about how many you run — the worst move is buying a spare; run a single series all the way through.
For primary crushing, one jaw crusher is enough (SJ.E series, 50–1,200 t/h); for secondary and fine crushing, one spring cone (SJ series, 110–550 t/h) or one multi-cylinder hydraulic cone (SK.D series, 145–1,000 t/h) can carry the load.
Every extra machine drags along more conveyors, chutes, foundations and bay width — civil and installation cost climbs faster than the machines themselves. What actually chokes a line at this size is the screen: as many deck surfaces as the product specs you sell, with screening area sized by the throughput of each stage — and in closed circuit the screen passes the crusher's discharge, which is a good deal larger than the saleable product.
Shuangjin sizes this tier in order: fix the product specifications first, set the number of stages from the total reduction ratio, then match the machine models and the deck count last.
Applicable models: Shuangjin SJ.V series jaw crushers / SJ spring cone crushers / SK.D multi-cylinder hydraulic cone crushers
Related product: SJ.E jaw crusher
Ask us directly. If it is a question we are asked often, it becomes the next article — and you get the answer either way.